According to the investigation, the Vertical roller mill is one of the most popular mill equipments on the market. Because of its powerful functions, it can meet the needs of various materials. But today SBM heavy machine is not to talk to you about the strength of the Vertical roller mill. Where, but to introduce the installation skills and precautions of the Vertical roller mill!

First, you need to determine the reference point, and then use the tape measure and the ground gauge to measure the center position of the Vertical roller mill according to the reference point. Once you have determined the location, you need to clean the ground to make it flat without pebbles. Next, fix the base bracket and gasket, then clean the same surface to reduce the impurities on the surface of the base, and then install the reducer on the base of the main unit. The same motor base is also installed in the same way as the reducer. In order to prevent these Vertical roller mill base components from being weak, it is of course necessary to weld them. And it is necessary to fully consider the problem that the component may be distorted after welding, so it is necessary to prepare the distortion of the component before welding, so that the distortion after welding does not affect the susceptor.

timg (2).jpg

After the above steps are completed, the next step is the grouting operation of the Vertical roller mill, but it should be fully prepared before grouting. For example, if loose concrete parts are removed and the concrete surface to be wetted is used, the influence of the weather on the grout should also be taken into consideration, so sufficient preparation must be made to grout. Next, you need the heart of the Vertical roller mill and the reducer. Before installing the reducer, the bottom plate impurities must be inspected and cleaned, and then the epoxy resin is poured under the bottom plate to ensure that the reducer operates normally. After cleaning the grinding disc, it can be placed on the reducer through the positioning hole on the grinding disc. However, it must be ensured that the grinding disc is horizontal to the reducer, and there is no inclination. After the rear screw is tightened, the grinding disc is installed.

Before installing the rocker arm device, it is necessary to lubricate the oil and correct the direction of the rocker arm rotation. The same roller needs to be oiled. Then place the rocker arm device and the grinding roller on the grinding disc and support it with the loading and unloading tool. Of course, the Vertical roller mill is also indispensable to install the classifier. First install the body, then connect the angle steel and bolts according to the pre-drawn marks, then smooth the weld and the cutting port, and then install the rotor machine and the classifier drive equipment. The classifier is installed. Of course, there is still a heavy weight of equipment that needs to be installed, that is the power of the Vertical roller mill, the main motor. The post-installation design requires the installation of a water pipe for the installation of the cooling water line, and a Vertical roller mill is thus completed.

The accuracy of the installation determines the effect of the Vertical roller mill in a certain degree of layering, so how to install it is very important. SBM heavy machine introduced to you this time is a practical article, I hope to help everyone!